Friday August 21 saw the hall sitting happily on its new stumps. Sporting a new “flat look” visitors can see just how far parts of it had sunk. Very little internal damage was sustained – the advantage of wooden construction – and the only internal issue is the large instrument cupboard which was built when [...]
By admin on August 22, 2009 | Posted in Old News | Tagged restump |
Things are progressing nicely and about five trucks worth of concrete was poured and pumped under the hall. It’s all looking much more ship shape now. Once it’s dried a bit the hall will be lowered onto the poles and properly leveled. It seems that the back area of the hall where the toilets are [...]
By admin on August 20, 2009 | Posted in Old News | Tagged restump |
With the holes dug and inspected under the hall is looking a lot cleaner after a lot of rubbish and dirt has been removed. The poles are being hung and once they’re ready concrete will be poured around them.
By admin on August 20, 2009 | Posted in Old News | Tagged restump |
The lads from Lammi Bros Restumping and House Removals arrived Monday and have made great progress on removing the old stumps and digging the larger holes for the new ones. A quick water level around the hall showed that the whole building was virtually twisted and no two parts the same height as any other!
We [...]
By admin on August 9, 2009 | Posted in Old News | Tagged restump |
Whoa! It’s certainly an interesting view of the state of things under the hall. All this will be totally replaced:
By admin on August 9, 2009 | Posted in Old News | Tagged restump |
Preliminary work on the hall begins!
By admin on August 9, 2009 | Posted in Old News | Tagged restump |
Gambling Community Benefit Fund has contributed to our hall restumping
By admin on July 4, 2009 | Posted in Old News | Tagged restump |