With the holes dug and inspected under the hall is looking a lot cleaner after a lot of rubbish and dirt has been removed. The poles are being hung and once they’re ready concrete will be poured around them.
Holes done, poles next
on August 20, 2009This entry was posted in Old News and tagged restump. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.